Hi,
I'm still evaluating panelica.
In the migration report I miss informations why the migration failed.
All what I can see is that:
[17:26:54] [error] [database_import] Step Database Import failed: cancelled
[17:26:54] [warn] [database_import] Starting rollback...
But why and what is the exact reason?
Also is there a need for longer timeouts. A database with several GB of size needs more time for import. So 30 minutes timeout can maybe to short.
Regards
Chris
I'm still evaluating panelica.
In the migration report I miss informations why the migration failed.
All what I can see is that:
[17:26:54] [error] [database_import] Step Database Import failed: cancelled
[17:26:54] [warn] [database_import] Starting rollback...
But why and what is the exact reason?
Also is there a need for longer timeouts. A database with several GB of size needs more time for import. So 30 minutes timeout can maybe to short.
Regards
Chris